MAtraffic Advisory: Heavy delays on I-495 Southbound leading up to Route 2 in Littleton at bridge construction project. Reported to be backed-up as far as Lowell. Seek alternate route or plan accordingly. MSP has asked Mass DOT to evaluate and open lanes if necessary.
Update 7:35 a.m.
Contractor started last night making a emergency repair to the asphalt on the temporary bridge, bringing the highway down to one open lane. The second lane was just opened. The third lane is expected to be open by 8:00 a.m.
Update 8:09 a.m.
All lanes now open. Residual back-up remains.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.